The problem
A large power transformer now takes roughly three years to arrive, and the grain-oriented steel in its core comes from a single US plant. A data center with land, chips and customers lined up can still sit dark. Meanwhile coal and gas units are retiring across the country, and each leaves behind a generator step-up transformer sized for hundreds of megawatts with service life remaining. Nobody is matching the two.
Why now
YC's Winter 2027 Request for Startups names the bottleneck directly: three-year lead times and a single domestic source of core steel. Retirements scheduled across 2026 to 2030 release a wave of large units just as data-center demand peaks. The supply of used iron and the demand for fast power are both at their highest at once, and the window is a few years wide.
What it is
Rewind is a company that finds retiring generating units, tests their transformers, rewinds or re-rates them, and delivers them to developers who need power this year. This demo is the first product: a map where you drop your site, enter the MVA and high-side voltage you need, and see which retiring units within range could cover it, when each frees up, and the months saved against a new order. The units on the page are an illustrative sample, not EIA records, and ratings are estimated from nameplate MW. The full product adds real EIA-860 data, test records and quotes.
Who it's for
Developers and utilities with a site and a power deadline, who would use it while planning. It is not for owners of small distribution-class transformers, a market used-equipment dealers already serve, and not for buyers who can wait the full three years, because the saving is the whole pitch. It is also not a procurement tool for new units.
How it makes money
A margin on each requalified unit, plus fees for testing, rewinding and logistics. The developer pays because every month of delay on a large campus costs more than the premium. Later, a standing inventory of spare large transformers earns a rental or option fee. We deliberately take no subscription for the map: it is the way in, and charging for it would slow the first deals.
Go to market
Start with the dozen developers publicly stuck waiting on interconnection, reached through the power-procurement leads who already post about the transformer shortage. Each saved-site export is something a lead can forward to their utility counterpart as proof of a faster path. The first deals are one unit at a time, with Rewind doing the testing, so the first customers see a delivered, working transformer rather than a promise.